Melitas Marine Ltd
+30 (0)210 4118110-1
Melitas Marine Ltd
+30 (0)210 4118110-1
Hull & superstructure 122’
The project was built for a well known high quality Italian shipyard
The workmanship is of very good quality
Great part of the GRP basic structure are completed. The bottom is laminated
The stiffening system, namely longitudinal and transverse stiffeners of bottom, hull and deck are complete
Under the main deck, the steering gear room, the engine room, the accommodation areas and the bow thruster/ fore peak and the chain locker are divided with their respective bulkheads
Accommodation area below main deck is partly divided
Engine’s foundations are also finished, together with the exhaust pipes and the daily fuel tanks. Bossing nests are apparently finished
Note: the engines foundations are build taking into account that vessel is designed to be fitted with V-Drive gear systems
All tanks have been completed
Superstructure’s sides, stern, ladder to upper deck, main deck aft side stores as well as the upper deck structure are complete
Technical Data as per studies to finish;
Main Engines 2 x MTU 16V 2000 M93
2.400hp (2 x 1.790kw) at 2.450rpm
Max Speed: 27 knots
Range at 25knots: 2.120 nm
Fuel Capacity: 25.000 lt (6.613 US Gal)
Fresh Water: 3.700 lt (977.4 US Gal)
Generators: 2 Kohler 55kw
Bow thruster: Hydrosystems 44 kW 450mm
Stabilizer: optional
Water maker: 1 x 4.320 lt per day
Air-conditioning: max. cooling power 360.000 BTU
Accommodations
cabins: 5 (guests 10/12)
crew 3 cabins for 6 members
The Bare Hull is for sale - Nothing inside or inside of the structure!
The Company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change, or withdrawal without notice.
The project was built for a well known high quality Italian shipyard
The workmanship is of very good quality
Great part of the GRP basic structure are completed. The bottom is laminated
The stiffening system, namely longitudinal and transverse stiffeners of bottom, hull and deck are complete
Under the main deck, the steering gear room, the engine room, the accommodation areas and the bow thruster/ fore peak and the chain locker are divided with their respective bulkheads
Accommodation area below main deck is partly divided
Engine’s foundations are also finished, together with the exhaust pipes and the daily fuel tanks. Bossing nests are apparently finished
Note: the engines foundations are build taking into account that vessel is designed to be fitted with V-Drive gear systems
All tanks have been completed
Superstructure’s sides, stern, ladder to upper deck, main deck aft side stores as well as the upper deck structure are complete