Contact the Seller
Double cabin without a drop in the sheer line
hull aft of the engine room replaced the rest of the Hull treated
Smiths CRES
Engine room cleared
generator rebuilt
Transport Trailer/cradle refurbished (sandblasted Epoxy Painted Axels and Hubs rebuilt
Michelins
Chrome "cosmolined"
New teak Deck aft
Super Sundeck needs recovering (stripped to wood)
open galley
one helm
Master (Aft) disassembled (including Head) to facilitate Hull replacement.
Sound Vessel
Cabin top needs repainting due to cosmoline residue stains
Needs
re-wireing, Reassembly of Aft Cabin, Repaint cabin and fashion pieces. Reassemble windshield
Replace some cracked glass windows. RePower .